Sampling

What to check before you approve a diaper or pants sample

Most sample rejections are caused by an unstated requirement, not a bad sample. This checklist makes the requirement explicit before the trial starts.

Sample approval is the point where a sourcing project either becomes a supply relationship or a sequence of re-samples. Buyers who approve on feel alone tend to discover the problem at container scale, when change control is expensive.

Measure before you wear

  • Absorbency and retention. Ask for the test method and the result, not a claim. Absorption speed, rewet under pressure and total retention should be reported against a named protocol.
  • Fit dimensions. Waist range, rise, leg-cuff opening and the position of the absorbent core relative to the crotch. Fit failures are usually specification gaps, not manufacturing errors.
  • Leak performance at the target load. Test at the volume your market actually uses, in the position your user actually is — lying, sitting and standing behave differently.
  • Skin-contact feel and odour control. Subjective, so record who assessed it and against which comparator sample.

Record the construction, not just the result

An approval that records only "sample passed" leaves nothing to control production against. Record the core type, SAP ratio where disclosed, acquisition layer, backsheet and the pack format. That record becomes the change-control baseline.

Distinguish three kinds of failure

Specification failure: the product performs as designed, but the design does not meet the brief. Fix the brief, not the sample.

Construction failure: the design cannot meet the brief at any reasonable material cost. This is the moment to change route — for example from private label to custom development.

Sample execution failure: a hand-built sample does not represent line production. Ask for a pilot-line sample before you judge.

Ask what the laboratory validated

A sample should arrive with the validation it was approved on. COCO validates absorbency, rewet and penetration in its own laboratory and shares results before mass production; a supplier who cannot name the protocol they tested to is asking you to accept an opinion.

Frequently asked

How many samples should we approve? Approve a construction, then approve the pilot-line product. Two decisions, not one.

Can packaging change after approval? Artwork and pack format can change without touching the construction; construction changes should trigger re-validation.

Request a quote with the specification you need validated and we will confirm the test plan before sampling starts.